Engineering & Fabrication Projects
Steel Structure
31/03/2018 // Portasilo Ltd // Food // Project Budget
The steel frame structure included a stair tower and 4 x silo support structures. The project involved the fabrication and hot dip galvanising of 90 tonne of structural beams, columns, gratings and handrails for Frankly WTW, based in Birmingham. Due to tight time scales we supplied the structure in pre-assembled sections to reduce the overall time on the site installation.